Daily
Check lubrication oil and coolant levels, drain air filter water traps, clean chips from way covers and confirm the air pressure reading.
Weekly
Clean coolant tank strainers, inspect way wipers, check the hydraulic pressure gauge and clean the electrical cabinet filters.
Monthly
Check spindle warm-up behaviour, inspect belts, test emergency stops and door interlocks, and back up parameters and programs.
Every six months
Replace hydraulic and lube filters, check axis backlash, inspect ball screw lubrication and clean the coolant tank fully.
Yearly
Laser alignment and levelling, spindle run-out check, replace CNC memory batteries and review the machine history for repeat faults.
Make it automatic
MachiOn AMC plans turn this checklist into scheduled visits with a digital record for every machine.





